Designed to allow concrete to be poured into columns or shuttering with narrow or difficult access and then discharged at low level, reducing risk of aggregate separation.
Concrete is then discharged through a shutter into a fitted hopper on which the outlet terminates a 200mm diameter tube.
The design allows the operator to control the flow of materials from ground level by a rope connected to the shutter handle.
In order to maintain the lowest possible loading height, the skip is laid horizontal to load but automatically reverts to a vertical position when in use.
These skips are available in 500, 1000 & 2000 litres.